lp://qastaging/~hr-core-editors/hr-timesheet/7.0
- Get this branch:
- bzr branch lp://qastaging/~hr-core-editors/hr-timesheet/7.0
Branch merges
Related bugs
Bug #1235564: fails to import holidays into timesheet | Undecided | In Progress |
|
Related blueprints
Branch information
Recent revisions
- 68. By Pedro Manuel Baeza
-
[FIX] hr_timesheet_sheet: Fix error if there is no project associated to task.
[FIX] hr_timesheet_sheet: Tree view for hr.analytic.timesheet inherited instead of overwritten, to allow other modules to modifiy this view (for example, hr_timesheet_ department) .
[IMP] hr_timesheet_sheet: Remove obsolete type labels on XML views. - 66. By Lorenzo Battistini
-
[FIX] hr_attendance_
analysis: do not raise exception when float_start_time is greater than float_end_time due to python roundings - 65. By Alexis de Lattre
-
[FIX] We can now create a task and a work item directly after (without saving in between)
- 64. By Yannick Vaucher @ Camptocamp
-
[MRG] Port module hr_timesheet_
holidays and improve to support UTC timezone - 62. By Laetitia Gangloff (Acsone)
-
hr_attendance_
analysis: externalise contract calendar In order to be able to use another calendar in some extension modules:
- rename get_active_contracts to get_reference_ calendar and return the possible calendar attached to retrieve contract
- update code to take account of this change (_get_attendance_duration and print_calendar method)
- externalise store part of column in _store_rules to easily extends it
Branch metadata
- Branch format:
- Branch format 7
- Repository format:
- Bazaar repository format 2a (needs bzr 1.16 or later)
- Stacked on:
- lp://qastaging/~hr-core-editors/hr-timesheet/6.1