lp://qastaging/~agilebg/hr-timesheet/fix-hr_attendance_analysis-report-timezone
- Get this branch:
- bzr branch lp://qastaging/~agilebg/hr-timesheet/fix-hr_attendance_analysis-report-timezone
Branch merges
- Alex Comba - Agile BG (community): Disapprove
- Pedro Manuel Baeza: Needs Resubmitting
-
Diff: 71 lines (+28/-9)1 file modifiedhr_attendance_analysis/wizard/print_calendar_report.py (+28/-9)
Branch information
Recent revisions
- 70. By Lorenzo Battistini
-
[FIX] problem with times that after been converted to correct timezone change its date.
For example: 29/05/2014 00:12 GMT+2 >> 28/05/2014 22:12 UTC - 68. By Lorenzo Battistini
-
[FIX] hr_attendance_
analysis
using correct timezone to print the sign in/out time - 66. By Lorenzo Battistini
-
[FIX] hr_attendance_
analysis: do not raise exception when float_start_time is greater than float_end_time due to python roundings - 65. By Alexis de Lattre
-
[FIX] We can now create a task and a work item directly after (without saving in between)
- 64. By Yannick Vaucher @ Camptocamp
-
[MRG] Port module hr_timesheet_
holidays and improve to support UTC timezone - 62. By Laetitia Gangloff (Acsone)
-
hr_attendance_
analysis: externalise contract calendar In order to be able to use another calendar in some extension modules:
- rename get_active_contracts to get_reference_ calendar and return the possible calendar attached to retrieve contract
- update code to take account of this change (_get_attendance_duration and print_calendar method)
- externalise store part of column in _store_rules to easily extends it
Branch metadata
- Branch format:
- Branch format 7
- Repository format:
- Bazaar repository format 2a (needs bzr 1.16 or later)
- Stacked on:
- lp://qastaging/~hr-core-editors/hr-timesheet/7.0